From plan to BIM baseline, fast
Quick Model (LOD 200) Features
LOD 200 geometry where it matters
Generic elements modeled with approximate size, shape, location, and orientation—ideal for feasibility, test fits, and early coordination. Includes levels/grids, floorplates, core elements, and placeholder rooms/spaces for area reporting, organized with consistent categories and parameters.
Rapid plan‑to‑model workflow
Streamlined conversion of 2D plans (PDF/DWG) into a clean 3D baseline. Calibrated levels, traced footprints, and standardized naming deliver a dependable Quick Model (LOD 200) without over‑modeling—ready to share sooner.
Coordination and quantities, ready on day one
Out‑of‑the‑box views and schedules support quick takeoffs and early design decisions. Provides a reliable starting point for spatial coordination, option studies, and cost baselines at LOD 200.
Simple Pricing
Flexible pricing to match any budget or team size.
Starting at
Free scope review and sample view within 24 hours
What’s included
- LOD 200 scope: architectural core/shell, primary structure, major MEP placeholders
- Typical turnaround: 2–5 business days for projects up to 50,000 sq ft (≈4,650 m²)
- Inputs accepted: PDFs, CAD/DWG, markups; cloud intake and organized file naming
- Deliverables: Revit (2021+), IFC (2x3/4), and optional NWC for coordination
- Single coordinated model with levels, grids, shared coordinates, view templates
- Basic documentation set: floor plans, sections/elevations, 3D views
- QA/QC checklist and model health report included
- 1 revision cycle within 7 days of delivery (scope-aligned)
- Lite BIM Execution Plan (BEP) and clear scope matrix
- Secure NDA and data handling by default
Frequently asked questions
Ready to convert plans into BIM in days?
Send your PDFs or CAD. We scope the model, confirm LOD, and deliver a standards-ready Quick Model—native Revit + IFC, agreed naming, views, and QA.